|
After pulling 5 barrow loads of dirt out, Leveling and compacting I cleaned and laid 350 pavers (the first recycling of the old driveway ) Swept and vibrated 160kg of mortar mix in to the gaps then wet and brushed. Will clean up the finished over the next days as the mortar should be kept moist for a week, Not bad for my first paving job over 3 days with a 3yo π
If you can't fix it with a hammer, you've got an electrical problem mate
The following user(s) Liked this: stingray-63
|
|
|
Please Log in to join the conversation.
Last edit: by AndyAus.
|
|
You say that, but you appear to have accidently built a wall instead |
|
Please Log in to join the conversation. |
hahaha yeah I don't know why the photo's only load in landscape even when they are portrait? If you can't fix it with a hammer, you've got an electrical problem mate
|
|
|
Please Log in to join the conversation.
Last edit: by AndyAus.
|
|
Nice Andy.
|
|
Please Log in to join the conversation. |
|
Don't forget the susceptibility to oil stains, support for modern slavery, and water collecting in inappropriate low points |
|
Please Log in to join the conversation. |
|
If you can't fix it with a hammer, you've got an electrical problem mate
The following user(s) Liked this: stingray-63
|
|
|
Please Log in to join the conversation. |
|
3 down and 1 to go
If you can't fix it with a hammer, you've got an electrical problem mate
The following user(s) Liked this: stingray-63, jord001
|
|
|
Please Log in to join the conversation. |
|
If you can't fix it with a hammer, you've got an electrical problem mate
The following user(s) Liked this: stingray-63, Al
|
|
|
Please Log in to join the conversation.
Last edit: by AndyAus.
|